The project is located in Jiumiao Town in China. By replacing electricity generated by fossil fuel power plants, the implementation of the proposed project will result in a reduction in CO2 emissions over 100’000 t CO2-eq per year. The aim of the project is to create wind power with zero emissions and transmit it to the Northeast China Power Grid (NEPG). Prior to the start of the project activity, the scenario was that NEPG would provide the same electricity service as the proposed project. The proposed project involves the installation of 33 turbines, each with a rated output of 1'500kW, resulting in a total capacity of 49,5MW.